30M x 256M Heavy Industry Piping Factory

Home /Projects /DSAW / 30M x 256M Heavy Industry Piping Factory

Project Details

Project:

30M x 256M Heavy Industry Piping Factory

Client:

PT. Dwi Sumber Arca Waja

Location:

Kawasan Industri Terpadu Kabil (KITK), Kabil - Batam, Indonesia

Construction Period:

February - August 2026

Scope of Works:

  • Civil Works
  • Steel Structure
  • Architectural Works

Project Overview

Construction of a 30m x 256m heavy pipe manufacturing workshop for PT. Dwi Sumber Arca Waja (DSAW) in Kabil, Batam, served by 50-ton overhead cranes. MKKP delivered the civil works, PEB steel structure and architectural works, including complex machine foundations carrying more than 2,000 tons of JCO pipe-forming machinery and a high-flatness concrete floor for automatic handling systems. Appointed after a previous contractor failed, MKKP stayed ahead of an accelerated schedule so the machinery could be installed on arrival.

Project Videos

Civil Works

Machine Foundation Works

End Bevelling
Hydrotest
Calibrator
Tack Welding
Post Crimping
J.C.O.
Edge Milling

Foundation Works

Slab Works

Steel Structure

Architectural Works

Workshop

Office

Substation

Drainage & External Works

Project Completion