Opening Hour: (10.00-17.00)
30M x 256M Heavy Industry Piping Factory
PT. Dwi Sumber Arca Waja
Kawasan Industri Terpadu Kabil (KITK), Kabil - Batam, Indonesia
February - August 2026
Construction of a 30m x 256m heavy pipe manufacturing workshop for PT. Dwi Sumber Arca Waja (DSAW) in Kabil, Batam, served by 50-ton overhead cranes. MKKP delivered the civil works, PEB steel structure and architectural works, including complex machine foundations carrying more than 2,000 tons of JCO pipe-forming machinery and a high-flatness concrete floor for automatic handling systems. Appointed after a previous contractor failed, MKKP stayed ahead of an accelerated schedule so the machinery could be installed on arrival.